Skip to main content
Skip to main content
Collections Menu
Proposal: Site # 3 Interstate 5's Cherry Street Exit and Access Ramp
Proposal: Site # 3 Interstate 5's Cherry Street Exit and Access Ramp
Proposal: Site # 3 Interstate 5's Cherry Street Exit and Access Ramp

Proposal: Site # 3 Interstate 5's Cherry Street Exit and Access Ramp

Artist Alan Finkel
MediumBlack and white photostat, colored pencil, acrylic
Dimensions25 1/2 x 38 1/4 x 1 1/4 in. (64.8 x 97.2 x 3.2 cm)
ClassificationsMixed Media
Credit LineSeattle City Light 1% for Art Portable Works Collection
This is not an actual finished artwork in the usual sense of fine art. The work was submitted as a proposal for a commissioned artwork that was subsequently never actually realized.  Interestingly, it is a proposal depicting Gateway (Key) Tower under construction and the accompanying on-ramp that tunnels under the building.
Duwamish River Project #5
Ford Gilbreath
1996
Duwamish River Project #3
Ford Gilbreath
1996
Hiding Behind Sagebrush
Dick Ibach
1985-86
A Square Full of Circles #1
Philip E. Harding
2015
Street Artist (#5)
Dean Wong
1993
Jackson Street (#3)
Dean Wong
1992
Changes 1
Alan Lau
1995
Geometry Ends Life 2
Derek Franklin
2008
Geometry Ends Life 1
Derek Franklin
2008